construction planning and scheduling

civil engineering multi-part question and need the explanation and answer to help me learn.

Following the Work Breakdown Structure Homework Sheet below, complete and then upload your outline and activities.
To receive full points, you must:
a) develop a WBS with at least 3 levels (10 pts),
b) your WBS captures all project scope elements (10 pts) and
c) identify a preliminary list of activities needed (10 pts)
Requirements: as long as it has to be
CON E 401 WBS Activities 30 pts For the project shown below: 1. develop a WBS with at least 3 levels (use the format shown below) 2. for each WBS item (at the lowest level, e.g. 1.2.1 Fencing) identify a preliminary list of activities needed to construct the item. Show the WBS as follows: 1- Project 1.1 (e.g. Site preparation) 1.1.1 … 1.1.2 … 1.2 … e.g. Sitework 1.2.1 Fencing 1.2.2 … 1.2.3 … 1.3 Foundations 1.3.1 … 1.3.2 …. 1.4 Etc.………. 1.4.1 ….. 1.4.2 … 1.5 Etc. 1.5.1 …. 1.5.2 …

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *